It is about the recovery of a historic building, transforming its use as a hotel. With about 5500m² of heated area, the designed system consists of VRF systems designed to control the ambient temperature or thermal correction of new air and is also considered the production of domestic hot water consisting of a gas boiler and storage tanks. GM also designed the building's gas network powered by the hotel's mechanical systems and kitchen.